Basement Finishing

Basement Finishing in Utah County

Complete basement finishing in Utah County—framing through trim, one contract, a written scope and a price before anything is started.

Get A Free Estimate
Free on-site walkthrough · Licensed & insured
What's Included

Every trade, start to finish.

One contract, one point of contact, one schedule. You're not hiring a framer, then chasing an electrician, then waiting on a drywall crew.

01

Planning

  • Design + layout
  • Finish selections
  • Permits + inspections
  • Written scope of work
02

Structure + Systems

  • Framing + soffits
  • Egress windows
  • Electrical
  • Plumbing
  • HVAC runs
  • Insulation
03

Surfaces

  • Drywall + texture
  • Paint
  • Flooring
  • Tile + waterproofing
04

Finish Work

  • Doors + trim
  • Built-ins + millwork
  • Fixtures + hardware
  • Punch list + walkthrough
What It Can Become

The same square footage, six different ways.

Most basements end up as some combination of these. We'll help you decide what your family will actually use — not what looks good on a plan.

Bedrooms

The most common reason people finish. Each one needs an egress window sized to code, which we handle as part of the build.

Family + Theater Room

Usually the largest open space. Wiring for a projector or mounted TV gets planned during rough-in, not patched in after.

Bathroom

Full or three-quarter. Considerably simpler and less expensive if your builder left plumbing stubbed into the slab.

Kitchenette or Wet Bar

Sink, fridge, cabinetry, counter. Turns a basement into a space that works for guests, teenagers, or extended family.

Gym or Office

Both benefit from sound insulation and dedicated circuits — easy to plan for now, expensive to add later.

Storage That Stays

Mechanical room, cold storage, and a real storage room. Finishing shouldn't mean losing everywhere to put things.

Your Investment

A straight answer on price.

Most contractors won't put a number on a page. Here's ours: in Utah County, basement finishing generally lands in one of two ranges depending on whether a bathroom is part of the plan. Plumbing is the single biggest swing in any basement budget.

No Bathroom
$30–55/ sq ft

Bedrooms, family room, and storage. Framing, electrical, HVAC, insulation, drywall, paint, flooring, doors and trim — everything but plumbing fixtures.

A 1,000 sq ft basement · roughly $40,000–55,000
With A Bathroom
$50–75/ sq ft

Everything above, plus a full or three-quarter bath — plumbing rough-in, tile and waterproofing, vanity, fixtures, and ventilation.

A 1,000 sq ft basement · roughly $55,000–75,000
If Your Slab Is Already Stubbed

Most homes built in the last fifteen years have plumbing capped in the concrete. That keeps a bathroom near the bottom of the range. Without it, we cut and trench the slab — real work, real cost, and it goes in your estimate on day one.

Quoted Separately

Egress windows, if a bedroom needs one cut. Radon mitigation, if testing calls for it. Structural work, if we find it. These are line items, not surprises — you'll see them before you sign.

What You Can Expect
Written Scope

Every project starts with a documented scope of work — so you know exactly what's included, what isn't, and what to expect before you sign anything.

Fixed Price

One number. What we quote is what you pay — no surprise invoices at the finish line.

Draw Schedule

Payments tied to clear milestone completions — not arbitrary dates. You only pay as work gets done.

Financing Available

Monthly payment options through our lending partner. No lien on your home, and no credit impact to see your options.

Get Your Number
Ranges are typical for Utah County and are not a quote. Your written estimate is built from your actual space and locked before work starts.
How We Work

Clear steps. No surprises.

Three phases, each finished before the next begins. You'll know the scope, the price, and the schedule before a single wall goes up.

01

Vision + Scope

Discovery call, then an in-home walkthrough and measurements. You leave knowing what's possible and what's realistic.

02

Design + Budget

Layout, selections, written scope. Fixed-price contract and draw schedule before anything is ordered.

03

Build + Communication

Regular updates, a clean job site, and a final walkthrough and sign-off before we call anything done.

Contract & Design 2–4 weeks
Build 5–8 weeks
Permits & Inspections Handled by us
Financing

Start now, not someday.

The years you'd spend saving for a finished basement are years you could be living in one. Monthly payment options are available through Acorn Finance, an independent lending marketplace with a network of more than thirty lenders.

  • Credit ImpactNone to check your rate
  • Your HomeNo lien, no equity required
  • FundingTypically 1–2 business days
  • Time To CheckAbout a minute
See Financing Options
Check Your Rate

See personalized offers without touching your credit score.

Acorn Finance — apply and get affordable payment options from multiple lenders

VH Design + Build is not a lender, financial advisor, or credit provider. All financing decisions, approvals, rates, and terms are determined solely by the lender based on your qualifications and are governed by the agreement between you and your chosen lender.

Common Questions

Basement questions, answered.

What if my basement isn't plumbed for a bathroom?

Still doable, it just costs more. Adding plumbing means cutting and trenching the concrete slab to run drain lines, then patching it back. Basements with stub-outs already in place are considerably simpler.

Do I need an egress window?

If any room in the plan will be used as a bedroom, yes. It has to be large enough to climb out of and for a firefighter to climb in through. If your basement doesn't have one, cutting the opening through the foundation wall is part of the job — we quote it as its own line item so you see the cost before you sign.

Do you handle permits and inspections?

Yes. We pull the permit and meet the inspector on site. Requirements and fees vary between Utah County cities, so we confirm with your building department before pricing the job rather than assuming.

What if I want to change something mid-build?

People do, and it's normal. You tell us what you want, we price it in writing before anyone touches it, and you sign off. Only then does it get built and added to the contract total.

No change happens on a handshake, and nothing shows up as a line item you didn't approve. If a change affects the schedule, we tell you that at the same time as the cost.

How do payments work?

Payments follow a draw schedule tied to milestone completions rather than calendar dates — you're paying for work that's finished, not for a week that's passed. The schedule is written into the contract before we start, so you know every payment amount and what triggers it in advance.

When do we need to give access to the home?

As much as you can give. Access is one of the biggest factors in whether a build lands on schedule. Most homeowners set up a lockbox or a garage code so nobody has to be home waiting on us.

Service Area

Basement finishing across Utah County.

Eagle Mountain · Saratoga Springs · Lehi · American Fork
Provo · Orem · Pleasant Grove · Highland & Alpine

Not on the list? If you're in Utah County, ask — we likely cover it.

Ready When You Are

The space is there. The vision is yours.
We'll handle the rest.

Start The Conversation
Free on-site walkthrough · No obligation